Xin Longdi
English
Request a Quote
MenuClose

Xin Longdi / Equipment manufacturing

Scrubbers &
Process Equipment

Custom-fabricated PP and PPH equipment for industrial exhaust gas treatment.

PP / PPHProject-specific fabrication

Tall fabricated plastic tower with connected pipework, blue pumps and a base vessel in the Xin Longdi workshop
Fabricated equipment / Xin Longdi workshop

01 / Equipment scope

Built around
your process.

Scrubbers, spray and absorption equipment are fabricated to your application and agreed layout.

01

PP / PPH scrubbers

Custom-fabricated plastic scrubber equipment for industrial exhaust gas treatment projects.

02

Spray & absorption equipment

Spray towers and absorption equipment, configured according to the process requirements.

03

Fabricated assemblies

Equipment bodies, connections and related plastic assemblies made to the agreed project scope.

02 / Plastic welding & fabrication

Plastic welding.
Equipment fabrication.

Plastic welding brings fabricated components and equipment assemblies together. Materials, joints and assembly details follow the confirmed project requirements.

Explore Our Fabrication
Xin Longdi worker welding a plastic pipe connection, with the tool and joint visible
Plastic welding / connection fabrication
Workshop detail of fabricated plastic tower bodies with vertical pipework, flanged connections and two pumps
Pipework & pump assembly / workshop detail

03 / Connections & assemblies

Connections for
your equipment layout.

Interfaces are reviewed around the installation layout, alongside the equipment body.

Inlets & outlets
Connection positions and orientation to suit the agreed equipment layout.
Flanges & openings
Fabricated interfaces and access openings reviewed against the drawing.
Pipework & assemblies
Related piping and assembly details defined for the project.
Discuss Your Layout

04 / Material selection

PP & PPH

Thermoplastic construction for project-specific process equipment.

Material selection starts with the working environment.

Selection is project-specific. Gas and liquid media, operating conditions and fabrication details are reviewed before a material is confirmed.

Process review
Gas and liquid media
Project review
Operating and fabrication conditions

05 / Start with the requirements

Your process.
Our starting point.

A drawing and a short project brief help define what needs to be fabricated.

Send Your Drawing
  1. 01

    Process & operating conditions

    Intended use, gas composition and the operating conditions available for review.

  2. 02

    Drawing & installation layout

    Overall dimensions, connection locations and site access or space requirements.

  3. 03

    Material & supply scope

    Preferred material, required assemblies, quantity and delivery destination.

06 / Common questions

Before we
start fabrication.

Can you fabricate from our drawings?

Yes. Share your equipment drawing and process requirements. Dimensions, material, connection details and fabrication scope are reviewed before the specification is confirmed.

How are PP and PPH selected?

Material selection is project-specific. Share the gas and liquid media, operating conditions and any material requirements so suitability can be reviewed for the intended application.

Are the pipework and connections customizable?

Connection locations, flanges, openings and related plastic assemblies can be discussed against your layout. The supplied components and assembly scope are confirmed for each project.

What treatment performance can be specified?

Treatment targets and equipment specifications require a project review. Share the process conditions and your required outcome so the design basis and scope can be discussed before any performance commitment is agreed.

Let’s discuss the equipment

Discuss your
scrubber project.

Share your drawing, application and fabrication requirements with Xin Longdi.