PP / PPH scrubbers
Custom-fabricated plastic scrubber equipment for industrial exhaust gas treatment projects.
Xin Longdi / Equipment manufacturing
Custom-fabricated PP and PPH equipment for industrial exhaust gas treatment.
PP / PPHProject-specific fabrication

01 / Equipment scope
Scrubbers, spray and absorption equipment are fabricated to your application and agreed layout.
Custom-fabricated plastic scrubber equipment for industrial exhaust gas treatment projects.
Spray towers and absorption equipment, configured according to the process requirements.
Equipment bodies, connections and related plastic assemblies made to the agreed project scope.
02 / Plastic welding & fabrication
Plastic welding brings fabricated components and equipment assemblies together. Materials, joints and assembly details follow the confirmed project requirements.
Explore Our Fabrication

03 / Connections & assemblies
Interfaces are reviewed around the installation layout, alongside the equipment body.
Explore PP / PPH Pipes & Fittings
Workshop photographs show our manufacturing work; they do not establish a customer reference, equipment rating or guaranteed performance.
Workshop application references ↗04 / Material selection
Thermoplastic construction for project-specific process equipment.
Material selection starts with the working environment.
Selection is project-specific. Gas and liquid media, operating conditions and fabrication details are reviewed before a material is confirmed.
05 / Start with the requirements
A drawing and a short project brief help define what needs to be fabricated.
Send Your DrawingProvide gas and liquid media, gas flow rate, concentration, operating temperature and treatment targets. Include any known variation in operating conditions.
Share overall dimensions, inlet/outlet positions, interface drawings and installation space or access constraints.
List the equipment body, pipework and any requested fan, pump or controls. Supply, connection and site-installation responsibilities are agreed for the project.
06 / Common questions
Yes. Share your equipment drawing and process requirements. Dimensions, material, connection details and fabrication scope are reviewed before the specification is confirmed.
Material selection is project-specific. Share the gas and liquid media, operating conditions and any material requirements so suitability can be reviewed for the intended application.
Equipment bodies and fabricated plastic assemblies are reviewed first. Tell us which additional items and site work you require; fan, pump, control and installation responsibilities are confirmed separately for the project.
Provide gas and liquid media, flow rate, concentration, temperature and your treatment target. These inputs are reviewed before the design basis, supplied equipment and any performance commitment are agreed.
Let’s discuss the equipment
Share your drawing, application and fabrication requirements with Xin Longdi.