Request a Quote

Xin Longdi / Equipment manufacturing

Scrubbers &
Process Equipment

Custom-fabricated PP and PPH equipment for industrial exhaust gas treatment.

PP / PPHProject-specific fabrication

Tall fabricated plastic tower with connected pipework, blue pumps and a base vessel in the Xin Longdi workshop
Fabricated equipment / Xin Longdi workshop

01 / Equipment scope

Built around
your process.

Scrubbers, spray and absorption equipment are fabricated to your application and agreed layout.

01

PP / PPH scrubbers

Custom-fabricated plastic scrubber equipment for industrial exhaust gas treatment projects.

02

Spray & absorption equipment

Spray towers and absorption equipment, configured according to the process requirements.

03

Fabricated assemblies

Equipment bodies, connections and related plastic assemblies made to the agreed project scope.

02 / Plastic welding & fabrication

Plastic welding.
Equipment fabrication.

Plastic welding brings fabricated components and equipment assemblies together. Materials, joints and assembly details follow the confirmed project requirements.

Explore Our Fabrication
Xin Longdi worker welding a plastic pipe connection, with the tool and joint visible
Plastic welding / connection fabrication
Workshop detail of fabricated plastic tower bodies with vertical pipework, flanged connections and two pumps
Pipework & pump assembly / workshop detail

03 / Connections & assemblies

Connections for
your equipment layout.

Interfaces are reviewed around the installation layout, alongside the equipment body.

Inlets & outlets
Share connection locations, orientation and mating dimensions so they can be checked against the equipment layout.
Flanges & openings
Provide the flange/interface drawing, required standard and access-opening details for review; none is assumed.
Pipework & assemblies
List the related pipework and plastic assemblies required with the equipment. Confirm interfaces with any separately supplied components.

Explore PP / PPH Pipes & Fittings

Technical review checklist

Material / project definition
Provide gas / liquid media, flow, temperature, required duty and installation layout.
Document evidence
Agree equipment scope, performance acceptance criteria and responsibility for pumps, fans and controls.
Application conditions
State media, concentration, temperature, exposure time and load. Suitability is reviewed for the actual application.

Workshop photographs show our manufacturing work; they do not establish a customer reference, equipment rating or guaranteed performance.

Workshop application references ↗
Discuss Your Layout

04 / Material selection

PP & PPH

Thermoplastic construction for project-specific process equipment.

Material selection starts with the working environment.

Selection is project-specific. Gas and liquid media, operating conditions and fabrication details are reviewed before a material is confirmed.

Process review
Gas and liquid media
Project review
Operating and fabrication conditions

05 / Start with the requirements

Your process.
Our starting point.

A drawing and a short project brief help define what needs to be fabricated.

Send Your Drawing
  1. 01

    Process & operating conditions

    Provide gas and liquid media, gas flow rate, concentration, operating temperature and treatment targets. Include any known variation in operating conditions.

  2. 02

    Drawing & installation layout

    Share overall dimensions, inlet/outlet positions, interface drawings and installation space or access constraints.

  3. 03

    Material & supply scope

    List the equipment body, pipework and any requested fan, pump or controls. Supply, connection and site-installation responsibilities are agreed for the project.

06 / Common questions

Before we
start fabrication.

Can you fabricate from our drawings?

Yes. Share your equipment drawing and process requirements. Dimensions, material, connection details and fabrication scope are reviewed before the specification is confirmed.

How are PP and PPH selected?

Material selection is project-specific. Share the gas and liquid media, operating conditions and any material requirements so suitability can be reviewed for the intended application.

Does a scrubber quote include the fan, pumps, controls and installation?

Equipment bodies and fabricated plastic assemblies are reviewed first. Tell us which additional items and site work you require; fan, pump, control and installation responsibilities are confirmed separately for the project.

What treatment performance can be specified?

Provide gas and liquid media, flow rate, concentration, temperature and your treatment target. These inputs are reviewed before the design basis, supplied equipment and any performance commitment are agreed.

Let’s discuss the equipment

Discuss your
scrubber project.

Share your drawing, application and fabrication requirements with Xin Longdi.