
Manufacturing Showcase
PP Scrubber Tower Fabrication
Xin Longdi fabricates plastic scrubber tower bodies and connections for industrial exhaust treatment equipment. Share your drawing or duty requirements for scope review.
- Process
- Plastic tower and interface fabrication
- Material
- PP, subject to application review
- Scope
- Reviewed from your drawing or brief
- Acceptance
- Agreed per order
Share your drawing or describe the intended application.
Request a QuoteProduct illustrations show example designs.
01 / Applications
What to discuss
Scrubber towers and process equipment
Clarify whether you need a tower body, fabricated components or a broader equipment assembly. Define the boundary of supply before quotation.
02 / Engineering considerations
What to specify
- Gas and liquid conditions
- Share gas composition, temperature, flow information and the proposed scrubbing liquid for review.
- Connections and equipment scope
- Specify gas and liquid ports, flange standards, access openings and which components are included.
- Design and performance responsibility
- Identify who supplies the process design and which acceptance criteria must be agreed.
03 / Process
Manufacturing review
- Define the equipment scope
Review drawings, interfaces and the proposed duty.
- Fabricate the body and openings
Review the form and connection layout against the confirmed fabrication drawing.
- Agree supply boundaries
Confirm the components and inspection requirements for the requested scope.
Equipment and process details

Tower body with visible side openings
04 / Related
Products and technical resources
Discuss your requirements
Include the drawing, application and quantities for review.